Stapleton Filing 7 Stockpile Asbestos Remediation Project

Owner:

City and County of Denver

General Contractor: 

Kelley Trucking Inc.

Contract Amount: $3.9 M+

The project was located on a 35 acre site at the old Stapleton International Airport. A stockpile located onsite contained asbestos, and the surface soils surrounding the stockpile were contaminated with asbestos. The general scope of work included excavating a 300,000 CY stockpile, screening the stockpile for asbestos with asbestos inspectors and asbestos laborers (soil characterization), and placing and compacting the stockpile in a fill area, Removing 8,500 CY of Asbestos contaminated soil from the project by loading the soil into trucks, wrapping the soil with plastic in the trucks, and hauling the soil to a landfill, potholing the onsite stockpile to determine the degree of contamination and the size of the asbestos inspection crew needed for the stockpile screening operations, erosion control, seeding, surveying and quality control.